Clackamas Community College’s main road, Douglas Loop, was cracked, worn, and well beyond its design life. HDG provided civil engineering design services for the 2/3 mile replacement of the road, which included installation of new curbs, inlets, ADA accessibility, crosswalks, and full-depth reclamation (“FDR”) which allows for quicker replacement, less haul off, less import, and effective recycling of materials. The new asphalt over FDR section approach is designed for a 40-year period. The project is being completed in phases to allow continual access to the site.